User Tools

Site Tools


admin:poweroff

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
admin:poweroff [2022/04/19 12:11]
peppe
admin:poweroff [2023/09/27 10:19]
peppe
Line 1: Line 1:
 ===== Διακοπή ρεύματος και επαναφορά ===== ===== Διακοπή ρεύματος και επαναφορά =====
  
-PRINT BEFORE USE!+PRINT BEFORE USE!\\
 Material may not be available during shutdown process. Material may not be available during shutdown process.
  
-Updated 19/04/2022\\+Updated 08/09/2023\\
 \\ \\
   * Altus KVM 10.1.2.10   * Altus KVM 10.1.2.10
   * Cisco switch port 6: trunk for recovery   * Cisco switch port 6: trunk for recovery
   * Backup! Transfer to safe media!   * Backup! Transfer to safe media!
 +  * Windows 7 java6 VM on 10.1.2.40 (VLAN74: 10.7.4.4, MGMT: 10.1.2.193, Internet not available)
  
 ==== Διακοπή ρεύματος ==== ==== Διακοπή ρεύματος ====
 Poweroff: Poweroff:
 === Επίπεδο 1 === === Επίπεδο 1 ===
 +
 +== Unmount backup filesystem ==
 +  - uranus: umount /mnt
 +  - gaia: umount /mnt
 +
 +== EMC VNXe3100, 10.1.2.9 ==
 +Poweroff procedure (+WAIT, UNPLUG!)
 +
 +  Shut down the system
 +  
 +  The shutdown process can take between 25 to 45 minutes to complete.
 +  During this time, the connection to the system will be lost and
 +  you will not have access to Unisphere or the online help.
 +  
 +  1. From Unisphere, select Settings > Service System.
 +  2. Enter the Service password to access the Service System page.
 +  3. Under Service Actions, select Shut Down System.
 +  4. Click Execute service action to shut down the
 +     storage processors (SPs).
 +  5. In the Service Confirmation dialog box, click OK.
 +  6. Check the status of the shutdown process by looking at the
 +     SP LED indicators:
 +  
 +  On VNXe3100 and VNXe3150 systems, the shutdown process is complete
 +  when only the Storage Processor Power LEDs are blinking and all
 +  other Storage Processor LEDs are off.
 +  
 +  7. If you are relocating hardware, disconnect cables in the
 +     following order:
 +  
 +  Disconnect the power cables from disk-processor enclosure (DPE)
 +  to power down the SPs.
 +  Disconnect the power cable from the DAEs to power them down.
 +
 +
 == HP DL145G2 == == HP DL145G2 ==
   - Close control units poweroff   - Close control units poweroff
-  - titan (old printserver), iLO 10.1.2.12\\+  - titan (old printserver, "shutdown -p now"), iLO 10.1.2.12\\
   - csforum, iLO 10.1.2.30\\   - csforum, iLO 10.1.2.30\\
   - aeolus, iLO 10.1.2.150\\   - aeolus, iLO 10.1.2.150\\
-  - glaucus\\+  - glaucus, iLO 10.1.2.29\\
   - unmount /usr/home/{students,staff,grads} from scylla\\   - unmount /usr/home/{students,staff,grads} from scylla\\
  
Line 30: Line 66:
   * Z-printer storage shutdown (Long button press -> shutdown procedure)   * Z-printer storage shutdown (Long button press -> shutdown procedure)
      
 +== HP DL380G6 esxi5, 10.1.2.205, iLO 10.1.2.105 ==
 +  - alumni (alumni-vlan74)\\
 +  - dl380ws*
 +
 == HP DL380G6 esxi2, 10.7.4.6, iLO 10.1.2.102 == == HP DL380G6 esxi2, 10.7.4.6, iLO 10.1.2.102 ==
-  - titan-printserver (new printserver, titan-new)\\ +  - titan-printserver (new printserver, titan-new, 10.7.4.44)\\ 
-  - mysql-server\\+  - mysql-server (dbserver)\\
   - calliope-www (cse www, calliope-vlan74)\\   - calliope-www (cse www, calliope-vlan74)\\
  
Line 49: Line 89:
   * gaia   * gaia
  
-== HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == +== Dell R630 #2 (DOWN), 10.1.2.41, iLO 10.1.2.111 == 
-  * uranus-debian+  * uranus-nfs
  
 === Επίπεδο 3 === === Επίπεδο 3 ===
- 
-== EMC VNXe3100, 10.7.4.9 == 
-Poweroff procedure (+WAIT, UNPLUG!) 
- 
-  Shut down the system 
-   
-  The shutdown process can take between 25 to 45 minutes to complete. 
-  During this time, the connection to the system will be lost and 
-  you will not have access to Unisphere or the online help. 
-   
-  1. From Unisphere, select Settings > Service System. 
-  2. Enter the Service password to access the Service System page. 
-  3. Under Service Actions, select Shut Down System. 
-  4. Click Execute service action to shut down the 
-     storage processors (SPs). 
-  5. In the Service Confirmation dialog box, click OK. 
-  6. Check the status of the shutdown process by looking at the 
-     SP LED indicators: 
-   
-  On VNXe3100 and VNXe3150 systems, the shutdown process is complete 
-  when only the Storage Processor Power LEDs are blinking and all 
-  other Storage Processor LEDs are off. 
-   
-  7. If you are relocating hardware, disconnect cables in the 
-     following order: 
-   
-  Disconnect the power cables from disk-processor enclosure (DPE) 
-  to power down the SPs. 
-  Disconnect the power cable from the DAEs to power them down. 
- 
  
 == HP DL145G2 == == HP DL145G2 ==
-  - scylla, iLO 10.1.2.45\\+  - scylla ("shutdown -p now"), iLO 10.1.2.45\\
   - rescue, iLO 10.1.2.49\\   - rescue, iLO 10.1.2.49\\
  
Line 92: Line 102:
   - gatepc74\\   - gatepc74\\
   - gatepc76\\   - gatepc76\\
-  - clonezilla SE\\+  - clonezilla SE (drbl)\\
   - charybdis\\   - charybdis\\
  
Line 99: Line 109:
   * Shutdown 10.7.4.7   * Shutdown 10.7.4.7
   * Shutdown 10.7.4.125   * Shutdown 10.7.4.125
 +  * Shutdown Windows 7 java6 VM on 10.1.2.40
   * Shutdown 10.1.2.40   * Shutdown 10.1.2.40
   * Shutdown 10.1.2.41   * Shutdown 10.1.2.41
 +  * Shutdown 10.1.2.205
  
 == Power cables == == Power cables ==
Line 126: Line 138:
   - 1x rescue UPS   - 1x rescue UPS
  
-== EMC VNXe3100, 10.7.4.9 ==+== EMC VNXe3100, 10.1.2.9 ==
   Power up the system (20+ minutes! Check www!)   Power up the system (20+ minutes! Check www!)
      
Line 154: Line 166:
   - csforum, iLO 10.1.2.30\\   - csforum, iLO 10.1.2.30\\
   - aeolus, iLO 10.1.2.150\\   - aeolus, iLO 10.1.2.150\\
-  - glaucus\\+  - glaucus, iLO 10.1.2.29\\
   - scylla, iLO 10.1.2.45\\   - scylla, iLO 10.1.2.45\\
   - rescue, iLO 10.1.2.49\\   - rescue, iLO 10.1.2.49\\
Line 161: Line 173:
 === Επίπεδο 2 === === Επίπεδο 2 ===
  
-== HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == +== Dell R630 #2 (DOWN), 10.1.2.41, iLO 10.1.2.111 == 
-  * uranus-debian+  * uranus-nfs
   * check students FS   * check students FS
   * check grads FS   * check grads FS
   * check staff FS   * check staff FS
-  * check quotas+  * quotaoff -a 
 +  * quotacheck -a 
 +  * quotaon -a 
 +  * mount /mnt
  
 == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 ==
   * gaia   * gaia
 +  * mount /mnt
  
  
Line 192: Line 208:
   * mount /usr/home/{students,staff,grads}   * mount /usr/home/{students,staff,grads}
  
-== Εργαστήρια == +== HP DL380G6 esxi5, 10.1.2.205, iLO 10.1.2.105 == 
-  * Power up always on clients+  - alumni (www)\\ 
 +  - dl380ws*
      
 == 3D printers == == 3D printers ==
admin/poweroff.txt · Last modified: 2023/09/27 10:34 by peppe