User Tools

Site Tools


admin:poweroff

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
admin:poweroff [2022/04/14 12:30]
peppe
admin:poweroff [2023/09/27 10:19]
peppe
Line 1: Line 1:
 ===== Διακοπή ρεύματος και επαναφορά ===== ===== Διακοπή ρεύματος και επαναφορά =====
  
-Updated 13/04/2022\\+PRINT BEFORE USE!\\ 
 +Material may not be available during shutdown process. 
 + 
 +Updated 08/09/2023\\
 \\ \\
-  * Altus KVM 10.1.2.10\\+  * Altus KVM 10.1.2.10
   * Cisco switch port 6: trunk for recovery   * Cisco switch port 6: trunk for recovery
   * Backup! Transfer to safe media!   * Backup! Transfer to safe media!
 +  * Windows 7 java6 VM on 10.1.2.40 (VLAN74: 10.7.4.4, MGMT: 10.1.2.193, Internet not available)
  
 ==== Διακοπή ρεύματος ==== ==== Διακοπή ρεύματος ====
 Poweroff: Poweroff:
 === Επίπεδο 1 === === Επίπεδο 1 ===
 +
 +== Unmount backup filesystem ==
 +  - uranus: umount /mnt
 +  - gaia: umount /mnt
 +
 +== EMC VNXe3100, 10.1.2.9 ==
 +Poweroff procedure (+WAIT, UNPLUG!)
 +
 +  Shut down the system
 +  
 +  The shutdown process can take between 25 to 45 minutes to complete.
 +  During this time, the connection to the system will be lost and
 +  you will not have access to Unisphere or the online help.
 +  
 +  1. From Unisphere, select Settings > Service System.
 +  2. Enter the Service password to access the Service System page.
 +  3. Under Service Actions, select Shut Down System.
 +  4. Click Execute service action to shut down the
 +     storage processors (SPs).
 +  5. In the Service Confirmation dialog box, click OK.
 +  6. Check the status of the shutdown process by looking at the
 +     SP LED indicators:
 +  
 +  On VNXe3100 and VNXe3150 systems, the shutdown process is complete
 +  when only the Storage Processor Power LEDs are blinking and all
 +  other Storage Processor LEDs are off.
 +  
 +  7. If you are relocating hardware, disconnect cables in the
 +     following order:
 +  
 +  Disconnect the power cables from disk-processor enclosure (DPE)
 +  to power down the SPs.
 +  Disconnect the power cable from the DAEs to power them down.
 +
 +
 == HP DL145G2 == == HP DL145G2 ==
-  - titan (old printserver), iLO 10.1.2.12\\+  - Close control units poweroff 
 +  - titan (old printserver, "shutdown -p now"), iLO 10.1.2.12\\
   - csforum, iLO 10.1.2.30\\   - csforum, iLO 10.1.2.30\\
   - aeolus, iLO 10.1.2.150\\   - aeolus, iLO 10.1.2.150\\
-  - glaucus\\+  - glaucus, iLO 10.1.2.29\\
   - unmount /usr/home/{students,staff,grads} from scylla\\   - unmount /usr/home/{students,staff,grads} from scylla\\
  
Line 24: Line 64:
   * Sun Ultra20 poweroff   * Sun Ultra20 poweroff
   * Z-printer poweroff   * Z-printer poweroff
-  * Z-printer storage shutdown+  * Z-printer storage shutdown (Long button press -> shutdown procedure)
      
 +== HP DL380G6 esxi5, 10.1.2.205, iLO 10.1.2.105 ==
 +  - alumni (alumni-vlan74)\\
 +  - dl380ws*
 +
 == HP DL380G6 esxi2, 10.7.4.6, iLO 10.1.2.102 == == HP DL380G6 esxi2, 10.7.4.6, iLO 10.1.2.102 ==
-  - titan-printserver (new printserver, titan-new)\\ +  - titan-printserver (new printserver, titan-new, 10.7.4.44)\\ 
-  - mysql-server\\+  - mysql-server (dbserver)\\
   - calliope-www (cse www, calliope-vlan74)\\   - calliope-www (cse www, calliope-vlan74)\\
  
Line 45: Line 89:
   * gaia   * gaia
  
-== HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == +== Dell R630 #2 (DOWN), 10.1.2.41, iLO 10.1.2.111 == 
-  * uranus-debian+  * uranus-nfs
  
 === Επίπεδο 3 === === Επίπεδο 3 ===
- 
-== EMC VNXe3100, 10.7.4.9 == 
-Poweroff procedure (+WAIT, UNPLUG!) 
- 
-  Shut down the system 
-   
-  The shutdown process can take between 25 to 45 minutes to complete. 
-  During this time, the connection to the system will be lost and 
-  you will not have access to Unisphere or the online help. 
-   
-  1. From Unisphere, select Settings > Service System. 
-  2. Enter the Service password to access the Service System page. 
-  3. Under Service Actions, select Shut Down System. 
-  4. Click Execute service action to shut down the 
-     storage processors (SPs). 
-  5. In the Service Confirmation dialog box, click OK. 
-  6. Check the status of the shutdown process by looking at the 
-     SP LED indicators: 
-   
-  On VNXe3100 and VNXe3150 systems, the shutdown process is complete 
-  when only the Storage Processor Power LEDs are blinking and all 
-  other Storage Processor LEDs are off. 
-   
-  7. If you are relocating hardware, disconnect cables in the 
-     following order: 
-   
-  Disconnect the power cables from disk-processor enclosure (DPE) 
-  to power down the SPs. 
-  Disconnect the power cable from the DAEs to power them down. 
- 
  
 == HP DL145G2 == == HP DL145G2 ==
-  - scylla, iLO 10.1.2.45\\+  - scylla ("shutdown -p now"), iLO 10.1.2.45\\
   - rescue, iLO 10.1.2.49\\   - rescue, iLO 10.1.2.49\\
  
Line 88: Line 102:
   - gatepc74\\   - gatepc74\\
   - gatepc76\\   - gatepc76\\
-  - clonezilla SE\\+  - clonezilla SE (drbl)\\
   - charybdis\\   - charybdis\\
  
 == ESXi(s) == == ESXi(s) ==
-  * Poweroff each 10.7.4.{6,7,125}, 10.1.2.{40,41}+  * Shutdown 10.7.4.6 
 +  * Shutdown 10.7.4.7 
 +  * Shutdown 10.7.4.125 
 +  * Shutdown Windows 7 java6 VM on 10.1.2.40 
 +  * Shutdown 10.1.2.40 
 +  * Shutdown 10.1.2.41 
 +  * Shutdown 10.1.2.205
  
 == Power cables == == Power cables ==
   - Unplug all machines   - Unplug all machines
-  - Turn off, unplug small UPSs +  - Turn off, unplug 2x online UPSs 
-  - Unplug CiscoHPmgmt switches+  - Turn off, unplug 1x rescue UPS (in rack) 
 +  - Unplug Cisco switch 
 +  - Unplug HP switch 
 +  - Unplug mgmt switch 
 +  - Unplug ATEN KVM
  
 == personal machines == == personal machines ==
Line 106: Line 130:
 === Επίπεδο 1 === === Επίπεδο 1 ===
  
-== EMC VNXe3100, 10.7.4.9 ==+== Power on == 
 +  - ATEN KVM 
 +  - Cisco switch 
 +  - HP switch 
 +  - mgmt switch 
 +  - 2x online UPSs 
 +  - 1x rescue UPS 
 + 
 +== EMC VNXe3100, 10.1.2.9 ==
   Power up the system (20+ minutes! Check www!)   Power up the system (20+ minutes! Check www!)
      
Line 134: Line 166:
   - csforum, iLO 10.1.2.30\\   - csforum, iLO 10.1.2.30\\
   - aeolus, iLO 10.1.2.150\\   - aeolus, iLO 10.1.2.150\\
-  - glaucus\\+  - glaucus, iLO 10.1.2.29\\
   - scylla, iLO 10.1.2.45\\   - scylla, iLO 10.1.2.45\\
   - rescue, iLO 10.1.2.49\\   - rescue, iLO 10.1.2.49\\
Line 141: Line 173:
 === Επίπεδο 2 === === Επίπεδο 2 ===
  
-== HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == +== Dell R630 #2 (DOWN), 10.1.2.41, iLO 10.1.2.111 == 
-  * uranus-debian+  * uranus-nfs 
 +  * check students FS 
 +  * check grads FS 
 +  * check staff FS 
 +  * quotaoff -a 
 +  * quotacheck -a 
 +  * quotaon -a 
 +  * mount /mnt
  
 == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 ==
   * gaia   * gaia
 +  * mount /mnt
  
  
Line 168: Line 208:
   * mount /usr/home/{students,staff,grads}   * mount /usr/home/{students,staff,grads}
  
-== Εργαστήρια == +== HP DL380G6 esxi5, 10.1.2.205, iLO 10.1.2.105 == 
-  * Power up always on clients+  - alumni (www)\\ 
 +  - dl380ws*
      
 == 3D printers == == 3D printers ==
-  * Power up+  * Sun Ultra20 poweron (+klipper, octoprint start) 
 +  * Tevo Tarantula poweron 
 +  * Z-printer poweron 
 +  * Z-printer storage poweron 
 + 
 +== Close control units == 
 +  * Power on 
      
  
admin/poweroff.txt · Last modified: 2023/09/27 10:34 by peppe