This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
admin:poweroff [2023/09/27 10:19] peppe |
admin:poweroff [2026/05/29 13:25] (current) peppe |
||
|---|---|---|---|
| Line 4: | Line 4: | ||
| Material may not be available during shutdown process. | Material may not be available during shutdown process. | ||
| - | Updated | + | Updated |
| \\ | \\ | ||
| * Altus KVM 10.1.2.10 | * Altus KVM 10.1.2.10 | ||
| Line 18: | Line 18: | ||
| - uranus: umount /mnt | - uranus: umount /mnt | ||
| - gaia: umount /mnt | - gaia: umount /mnt | ||
| + | |||
| + | == Terramaster F4-424 NAS == | ||
| + | - Shutdown | ||
| == EMC VNXe3100, 10.1.2.9 == | == EMC VNXe3100, 10.1.2.9 == | ||
| Line 51: | Line 54: | ||
| == HP DL145G2 == | == HP DL145G2 == | ||
| - Close control units poweroff | - Close control units poweroff | ||
| - | - titan (old printserver, | + | - (NOT!) |
| - csforum, iLO 10.1.2.30\\ | - csforum, iLO 10.1.2.30\\ | ||
| - | - aeolus, iLO 10.1.2.150\\ | ||
| - glaucus, iLO 10.1.2.29\\ | - glaucus, iLO 10.1.2.29\\ | ||
| - unmount / | - unmount / | ||
| Line 82: | Line 84: | ||
| == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | ||
| - | * examservers | + | * (NOT!) |
| === Επίπεδο 2 === | === Επίπεδο 2 === | ||
| Line 101: | Line 103: | ||
| - gatepc73\\ | - gatepc73\\ | ||
| - gatepc74\\ | - gatepc74\\ | ||
| - | - gatepc76\\ | + | - <del>gatepc76</ |
| - | - clonezilla SE (drbl)\\ | + | - <del>clonezilla SE (drbl)</ |
| - charybdis\\ | - charybdis\\ | ||
| Line 138: | Line 140: | ||
| - 1x rescue UPS | - 1x rescue UPS | ||
| - | == EMC VNXe3100, 10.1.2.9 | + | == Terramaster F4-424 NAS == |
| - | Power up the system (20+ minutes! Check www!) | + | |
| - | | + | |
| - | To power up a system that is fully powered down: | + | |
| - | 1. Reconnect the power cables to each DAE in the following exact order: | + | |
| - | DAE 0 | + | |
| - | DAE 1 | + | |
| - | DAE 2 | + | |
| - | Power up any remaining DAEs in ascending order. | + | |
| - | + | ||
| - | The green Power Status LED powerlines.gif on each DAE turns on. | + | |
| - | For more information on the LEDs, see System LED displays. | + | |
| - | 2. Reconnect the power cables to each SP in exactly this order: | + | |
| - | SP A | + | |
| - | SP B | + | |
| - | + | ||
| - | The green Power Status LED on each SP turns on. | + | |
| == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == | == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == | ||
| + | Add " | ||
| - gatepc73\\ | - gatepc73\\ | ||
| - gatepc74\\ | - gatepc74\\ | ||
| - | - gatepc76\\ | + | - <del>gatepc76</ |
| - | - clonezilla SE\\ | + | - <del>clonezilla SE</ |
| == HP DL145G2 == | == HP DL145G2 == | ||
| - | - titan (old printserver), | + | - (NOT!) |
| - csforum, iLO 10.1.2.30\\ | - csforum, iLO 10.1.2.30\\ | ||
| - | - aeolus, iLO 10.1.2.150\\ | ||
| - glaucus, iLO 10.1.2.29\\ | - glaucus, iLO 10.1.2.29\\ | ||
| - scylla, iLO 10.1.2.45\\ | - scylla, iLO 10.1.2.45\\ | ||
| Line 181: | Line 169: | ||
| * quotacheck -a | * quotacheck -a | ||
| * quotaon -a | * quotaon -a | ||
| - | * mount /mnt | ||
| == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | ||
| * gaia | * gaia | ||
| - | * mount /mnt | ||
| - | |||
| === Επίπεδο 3 === | === Επίπεδο 3 === | ||
| Line 193: | Line 178: | ||
| - calliope-www (cse www)\\ | - calliope-www (cse www)\\ | ||
| - titan-printserver (new printserver)\\ | - titan-printserver (new printserver)\\ | ||
| - | - mysql-server (NOT!)\\ | + | - mysql-server (Only fall semester)\\ |
| == HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == | == HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == | ||
| Line 200: | Line 185: | ||
| == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == | == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == | ||
| - engineering www (jupiter)\\ | - engineering www (jupiter)\\ | ||
| - | - charybdis | + | - (NOT!) |
| == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | ||
| - | * examservers | + | * (NOT!) |
| == scylla mounts == | == scylla mounts == | ||
| Line 217: | Line 202: | ||
| * Z-printer poweron | * Z-printer poweron | ||
| * Z-printer storage poweron | * Z-printer storage poweron | ||
| + | |||
| + | == EMC VNXe3100, 10.1.2.9 == | ||
| + | Power up the system (20+ minutes! Check www!) | ||
| + | | ||
| + | To power up a system that is fully powered down: | ||
| + | 1. Reconnect the power cables to each DAE in the following exact order: | ||
| + | DAE 0 | ||
| + | DAE 1 | ||
| + | DAE 2 | ||
| + | Power up any remaining DAEs in ascending order. | ||
| + | | ||
| + | The green Power Status LED powerlines.gif on each DAE turns on. | ||
| + | For more information on the LEDs, see System LED displays. | ||
| + | 2. Reconnect the power cables to each SP in exactly this order: | ||
| + | SP A | ||
| + | SP B | ||
| + | | ||
| + | The green Power Status LED on each SP turns on. | ||
| + | | ||
| + | * uranus, gaia mount /mnt | ||
| + | |||
| == Close control units == | == Close control units == | ||